Panels built in a controlled factory have tighter tolerances and are tested before they travel. On site they are lifted into place in hours, not weeks.

It reduces scaffold time, noise and risk, and it keeps the building weather-tight earlier.

We use prefabrication wherever the design allows it, and say so at quote stage.