Concrete gains strength through a chemical reaction that slows as temperatures drop. Below five degrees the mix, the formwork and the curing all need adjusting.
We heat the aggregate and water, use accelerators where the structural engineer agrees, and insulate formwork so the slab keeps its own heat for the first days.
The result is a pour that reaches design strength on the same programme, with test cubes to prove it.
Yorum Yazın